The EV Charging Infrastructure Handbook
No Cover

The EV Charging Infrastructure Handbook

How Charging Networks Really Work: Site Selection and Host Agreements, Grid Connection and Make-Ready, Demand Charges, Utilization and Pricing, Uptime, Public Funding, Fleet Depots, Project Economics and the Career

Julian R. Sterling

A 12-charger fast-charging hub on a retail park cost $2,612,000 to build, earns a 9.0 percent unlevered return with a federal credit of $538,800 and only 5.1 percent without it, and one failed power module held its worst port to 96.75 percent uptime against a 97 percent target.

The EV Charging Infrastructure Handbook is a practitioner's guide to developing, financing and running public and fleet charging networks. One fictional charge point operator is followed from the site screen to the sale of its portfolio: the host agreement, grid connection and make-ready, capital cost, electricity bills and demand charges, pricing and utilization, uptime under the federal formula, the site P&L, returns with and without the 30C credit, a NEVI-funded corridor site, a fleet depot on a charging-as-a-service contract, debt sizing and the buyer's valuation. Every figure of the case comes from one model.

Some of what the arithmetic shows: why a $0.235 per kWh limited-demand rate and a $0.068 per kWh standard rate can cost the same on a quiet month; how 768 kW of unmanaged depot peak falls to a 300 kW cap and saves $46,051 a year of demand charges; why 14 candidate sites narrowed to one that scored 81 of 100; and how a buyer values the same hub at $2,085,924 with no residual value.

Current to October 2026, with each real-world rule dated: the 30C credit and its 30 June 2026 cut-off, the NEVI minimum standards in 23 CFR 680, the J3400 connector and the electrician training rule. The companies, tariffs, prices and valuations of the case are teaching constructions, not any firm's figures. Not legal, tax, regulatory, engineering or investment advice.

The case is written out line by line in an appendix, so you can rebuild the hub model yourself.

What you will be able to do:
- Screen sites and read a host agreement, with its rent, exclusivity and relocation clauses
- Follow a grid connection from load letter to make-ready and read the capital cost of a hub
- Compare an EV rate with a standard rate and explain demand charges
- Price a kilowatt-hour, project utilization and build a site P&L
- Compute uptime under the federal formula and read a maintenance SLA
- Value the 30C credit and a NEVI grant in a return
- Model a fleet depot with managed charging and size debt on its contract
- Prepare a sale data room and plan a career in charging

Sixteen chapters and four appendices: the hub model line by line, a charging developer's toolkit of six tools, thirty interview questions with model answers, and a glossary of sixty terms.

Written for analysts and graduates joining a charging developer, utility program, infrastructure fund or lender, and for professionals moving into the sector. Part of The Private Markets Career Guides.

How this book was made: written with the help of artificial intelligence tools, under the author's direction; every figure was checked against its source.

Book Info

Publisher Julian R. Sterling
Release Date 2026-10-21
Page Count 224 Pages
File Size 478.4 KB
Language en-US

No download link available yet. You can .

Related Books

Similar recommendations you might enjoy

Join Telegram